π HOW DO STAND EXHIBITORS OR CONTRACTORS REGISTER TO ACCESS THE HALLS DURING BUILD-UP AND BREAKDOWN?
-
Stand Exhibitors: Your IBC Exhibitor Pass grants access during build-up, show days, and breakdown.
-
Contractors/Stand Builders: Must register for a Work Pass for access during build-up and breakdown only. This pass also provides free parking during these periods.
π« Work Passes do not grant access on show days.
π WHEN CAN STAND EXHIBITORS OR CONTRACTORS ACCESS THE HALLS?
Please refer to the Event Schedule for access dates and timings during build-up, show days, and breakdown.
β° CAN I PAY FOR EARLY ACCESS TO THE HALLS?
This depends on your stand type. See Build-Up and Breakdown timetables below:Β
BUILD-UP
BREAKDOWN
π HOW DO I BOOK A LOADING/UNLOADING SLOT FOR BUILD-UP & BREAKDOWN?
Booking details will be published in June 2025 β coming soon!
π¦ WHAT SHIPPING & STORAGE OPTIONS ARE AVAILABLE?
More information will be available shortly β stay tuned!
π WHAT ARE THE RULES FOR MY STAND TYPE?
Refer to the Stand Build Rules & Regulations for specific requirements based on your stand type.
β WHAT ITEMS ARE NOT PERMITTED ON STANDS?
View our guidelines on Permissible Stand Build Materials for details.
π« CAN WE PLACE STAND ITEMS IN THE AISLES DURING BUILD-UP?
-
Aisles must be kept clear at all times.
-
They will be marked with yellow tape during build-up and breakdown.
-
Waste (excluding small items) must be removed by contractors.
-
During show days, no items are allowed to protrude into aisles, including furniture or displays.
π§ Floor Managers will advise on safe and permitted areas during build-up.
π§± DO I NEED TO BUILD A WALL BETWEEN MY STAND AND NEIGHBOURS?
If you have a Space Only Stand, please refer to the Separation Wall section of the Space Only Stand Build Rules & Regulations.
πͺ WHAT RULES APPLY TO DOORS ON STANDS?
For Space Only Stands, see the Doors on Stands section of the Space Only Stand Build Rules & Regulations.
π WHAT IS THE STAND PLAN SUBMISSION PROCESS AND DEADLINE?
Refer to the Stand Plan Submission Guide for:
-
Required documents
-
Submission links
-
Review process
π Deadline: 20 June 2025
π§Ύ WHAT DOCUMENTS ARE NEEDED FOR DOUBLE DECKER STANDS?
Yes β a permit is required for Double Decker stands and can be ordered via the RAI Webshop.
Refer to the Double Decker Stand Submission Guide for:
-
Documentation requirements
-
Submission process
-
Applicable fees
β οΈ WHAT IF I MISS THE STAND PLAN SUBMISSION DEADLINE?
Please contact Abraxys immediately:
π§ ibc@abraxys.com
π§± WHATβS THE GUIDANCE FOR ERECTING OR DISMANTLING STANDS?
Please review our General Guidance on Erecting and Dismantling Structures:
-
A Method Statement and Risk Assessment must be provided and followed
-
All personnel must be competent and familiar with the documentation
-
Supervisors must be trained and able to read and understand build instructions
-
Any changes must be authorised in writing and re-approved by the Organiser and RAI structural engineer
-
Components must be clearly marked and lifted/stored appropriately
-
Deliveries must respect floor loading limits
-
PPE (hard hats, safety boots, hi-vis) is mandatory during build-up and breakdown
-
Welding and hot works require prior RAI approval
-
Only competent, certified operators may handle equipment
-
Forklift lifting of main decks is allowed with a completed and approved Method Statement
π HOW DO I ORDER PRODUCTS & SERVICES FOR MY STAND?
All exhibitors and contractors can order via the RAI Webshop
π§± CAN YOU RECOMMEND A STAND BUILDER?
Yes! IBC has a list of Verified Suppliers you can choose from:
π IBC2025 Verified Suppliers
βIβM HAVING AN ISSUE WITH A VERIFIED SUPPLIER β WHAT SHOULD I DO?
Please contact:
π§ support@ibc.org
Include full details of the issue in your email.